Will “Tile Layer” be Replaced By Robots? 🤔
83% Chance of Automation
“Tile Layer” will probably be replaced by robots.
This job is ranked #463 out of #702. A higher ranking (i.e., a lower number) means the job is less likely to be replaced.
Care to share? Click for Facebook, Twitter, LinkedIn, or XING. 👍
Job Description
Help brickmasons, blockmasons, stonemasons, or tile and marble setters by performing duties requiring less skill. Duties include using, supplying or holding materials or tools, and cleaning work area and equipment.
Job Details
- The SOC (Standard Occupational Classification) code is 47-3011.00
- The Mean Annual Wage in the U.S. is $ 33,610.00
- The Mean Hourly Wage is $ 16.00
- Currently, there are 23,950 people on this job
☝️ Information based on the reference occupation “Helpers--Brickmasons, Blockmasons, Stonemasons, and Tile and Marble Setters”.
Also Known As…
- Helpers--Brickmasons, Blockmasons, Stonemasons, and Tile and Marble Setters
- Tender, Labor
- Mortar Mixer
- Mason Tender, Restoration Labor
- Mason Tender
- Lead Mason Tender
- Hod Carrier
- Helper, Marble Finisher
- Helper
- Bricklayer Helper
- Brick and Blocker Aid, Labor
- Wood Tile Installation Helper
- Tombstone Erector Helper
- Tile Layer Helper
- Tile Helper
- Tile Finisher
- Refractory Tile Helper
- Patcher Helper
- Parquet Floor Layer's Helper
- Monument Setter Helper
- Mason Helper
- Marble Installation Helper
- Marble Finisher
- Hot-Top-Liner Helper
- Form Setter
- Form Layer
- Firebrick or Refractory Tile Bricklayer Helper
- Firebrick Layer Helper
- Firebrick and Refractory Tile Bricklayer Helper
- Concrete Form Setter and Finisher
- Concrete Form Setter
- Chimney Builder Helper
- Ceramic Tile Installation Helper
- Bricklayer Tender
- Brick Washer
- Brick Tender
- Brick Cleaner
- Brick Carrier
- Boring Machine Operator Helper
- Boat Joiner Helper
- Adobe Layer Helper
Tasks for “Tile Layer”
- Modify material moving, mixing, grouting, grinding, polishing, or cleaning procedures, according to installation or material requirements.
- Transport materials, tools, or machines to installation sites, manually or using conveyance equipment.
- Apply grout between joints of bricks or tiles, using grouting trowels.
- Remove excess grout or residue from tile or brick joints, using sponges or trowels.
- Mix mortar, plaster, and grout, manually or using machines, according to standard formulas.
- Clean installation surfaces, equipment, tools, work sites, or storage areas, using water, chemical solutions, oxygen lances, or polishing machines.
- Locate and supply materials to masons for installation, following drawings or numbered sequences.
- Correct surface imperfections or fill chipped, cracked, or broken bricks or tiles, using fillers, adhesives, or grouting materials.
- Arrange or store materials, machines, tools, or equipment.
- Apply caulk, sealants, or other agents to installed surfaces.
- Erect scaffolding or other installation structures.
- Move or position materials such as marble slabs, using cranes, hoists, or dollies.
- Provide assistance in the preparation, installation, repair, or rebuilding of tile, brick, or stone surfaces.
- Cut materials to specified sizes for installation, using power saws or tile cutters.
- Remove damaged tile, brick, or mortar, and clean or prepare surfaces, using pliers, hammers, chisels, drills, wire brushes, or metal wire anchors.
Related Technology & Tools
- Steam cleaning equipment
- Claw hammers
- Notebook computers
- Air compressors
- Winches
- Measuring tapes
- Tile-cutting saws
- Locking pliers
- Portable cranes
- Material moving cranes
- Wood chisels
- Personal computers
- Sandblasters
- Polishing machines
- Concrete vibrators
- Trowels
- Caulking guns
- Dollies
- Wire brushes
- Grout floats
- Power hoists
- Forklifts
- Concrete saws
- Power saws
- Ladders
- Heating torches
- Concrete mixers
- Grouting spatulas
- Grouting trowels
- Oxygen lances
- Power drills
- Grouting machines
- Power grinders
- Power chippers
- Safety boots
- Mortar mixers
- Pry bars
- Jackhammers
- Scaffolding
- Hydraulic booms
- CPR Visual Estimator
- Intuit QuickBooks
- TileGem
- Construction Management Software ProEst
- Aya Associates Comp-U-Floor
- Measure Square FloorEstimate Pro
- Daystar iStructural.com
- Tradesman's Software Master Estimator
- EasyCAD Iris 2D
- RISA Technologies RISAMasonry